In April 2019 Wagner Solar built a new solar power construction on the roof of a logistics center in Hesse Ebsdorfergrund. The construction is runned by the GreenVesting Solutions GmbH, which is based in Cölbe Hesse. For the installation of this 630 kWp construction we teamed up with the assembling G+H Solar GmbH.
As a mounting system we used our quick and easy to install flat roof system TRIC F duo east/west orientation. This highly flexible mounting system even insured, that the construction was able to be built around the skylight domes (that you can spot on the photos). Besides the mounting system we used round about 2000 LONGi Solar 300 Wp modules and ten SMA Core 1 inverters.
Plant Data:
- Utilized mounting system: TRIC F duo Ost/West
- Utilized modules: Longi 310 Wp
- Utilized inverters: SMA STP50-40 Core1
- Output: 620 kWp
- Operating company: GreenVesting Solutions GmbH